SERVICES · FREELANCE ROUTE

Agent infrastructure, scoped and measured.

Engagement shapes are published; floors are confirmed on the scope call, never an hourly meter. Single operator, so capacity claims are real by construction.

Architecture audit

A measured read of your agent infrastructure, with an allocation policy you can act on.

  • Context-budget and tool-surface analysis: schema cost, duplication, description overhead.
  • Harness review: memory design, permissions, cron/fleet topology.
  • A written allocation policy: what gets pinned, deferred, or cut, with the numbers behind it.

Timeline Fixed scope, one to two weeks.

Acceptance Findings ship with measurements you can re-run, not opinions.

Build engagement

A scoped build of the missing piece: MCP/CLI surfaces, harness components, or the cron fleet.

  • Agent infrastructure built to an agreed inventory, with edge cases prevented at the foundation.
  • MCP server and CLI surfaces for the same capability, with compressed output formats.
  • Governance from day one: linters and gates that agents cannot silently bypass.

Timeline Fixed scope, agreed in the first call.

Acceptance Acceptance criteria with numbers attached, written before the build starts.

Fractional operator

The ongoing operation: crons, monitoring, self-healing, iteration cadence.

  • Fleet operation with fail-closed gates and the failure protocol documented on this site.
  • Instrumentation that detects degradation: worklogs, health watchdogs, execution records.
  • A monthly measured report: runs, failures, fixes, cost.

Timeline Retainer, monthly cadence.

Acceptance The report is the acceptance: numbers, not narratives.

How it runs

  1. 1

    Scope call

    We define the problem, the inventory, and the constraints. No proposal before the problem is measured.

  2. 2

    Fixed scope and floor

    A fixed scope with a floor for the shape, never an hourly meter. The floor is confirmed on the call, before any work starts.

  3. 3

    Build, measured

    The build runs against the acceptance criteria. Done means measured, not demoed.

Start with the scope call

Bring the system, the constraints, and what "done" would measure. The proposal follows the measurement, not the other way around.

Email to scope a project